Founded in 2011, NASKU GmbH
provides a system that modifies
existing pile driver machines for
automation by autonomously
bringing the machine to its precise
location, and then driving the post
to its correct height and orientation.
Pile driving for solar projects can be
both physically taxing and mentally
intensive work as it requires the
utmost precision in placing posts
in the field relative to each other.
Operators traverse across vast
open fields, and must ensure
precise location and depth for
each steel pile driven into the
ground. Finding skilled labor is
both challenging and costly for
these projects. Advancements in
automated pile driving mean an
increase in overall productivity.
Highly Accurate Positioning
and Orientation Creates
Efficiencies and Enables a
Streamlined Approach to
Solar Field Construction
A Trailblazer in
the Field of Pile
Driving for Solar
Projects Across
the Globe
Overview
75%
2 CM
LABOR SAVINGS (WHEN COMPARED
TO TRADITIONAL METHODS)
ACCURATE POSITIONING
Operators must ensure precise location and depth
for each steel pile driven into the ground.