Improved Efficiency, Reduced Labor Costs,
Faster Project Execution
By automating site mapping, and the location and
measurement for each post, solar fields can eliminate the
need and expense for a full surveying crew. With the Trimble
BX992 receiver's centimeter level accuracy, NASKU can
deliver a system that only requires two operators to oversee
the pile driver's automation of measuring, drilling and placing
the posts in the ground, eliminating the need for additional
surveyors or skilled pile driving operators. Optimizing
the number of workers on site enables NASKU and their
customers to meet the needs of an evolving workforce. With
automated pile driving functionality delivering consistent
centimeter level accuracy, the NASKU system can place up
to 50 posts per hour, with only two operators which results
in significant labor savings up to 75% when compared to
traditional methods.
Results
Trimble Off-Road Autonomy Division
10368 Westmoor Drive
Westminster, Colorado 80021 USA
800-361-1249 (Toll Free)
+1-937-245-5154 Phone
fieldtech@construction.trimble.com
NASKU
With the Trimble BX992 receiver's centimeter-level accuracy, NASKU can
deliver a system that automates the measuring, drilling and placement of
the posts in the ground.